Renovations

Always Improving.

In a continued effort to provide a state-of-the-art member experience, HAC will be conducting renovations throughout the facility and retiring various pieces of equipment in favor of newer models. Here's what you can look forward to.

Adult Locker Room_edited.jpg

Men's Locker Room Renovation

Beginning December 3rd, 2022

We'll be making the following updates:

  • Installation of tempered glass shower stalls

  • Installation of tile floor in shower area

  • Installation of new steam room bench

Lockers and changing area will be available during renovations; showers will be closed. Pool must be accessed via the family locker room.

Women's locker room will undergo these renovations at a later date TBD.

Stretching Area.jpg

Stretching Area and Small Group Personal Training Renovations

Beginning December 5th, 2022

*Dates are subject to change.

This large-scale renovation will include the relocation of three spaces:

  • The current Elite PT space will become the new Stretching Area

  • The current Small Group Personal Training Studio will become the new Elite PT.

  • The current Stretching Area will become the new Small Group Personal Training Studio. Outside of designated SGPT hours, this space will serve as an extension of the main fitness floor, available for member use.

IMG_9567 email edit.jpg

CryoLounge Chair Installation

December 6th, 2022

We will be replacing two of the Hydromassage Chairs in the Recovery Realm with two new HydroMassage CryoLounge Chairs, which offer heat and cold therapy plus compression.

DSC_6848_edit.jpg

Fitness Floor Renovation

Beginning December 19th, 2022

During this large-scale renovation of the main fitness floor:

  • Indoor turf will be installed along the mirrored wall adjacent to the Aquatics Complex, transforming this space into a state-of-the-art functional training area.

  • Carpet will be replaced with modern rubber flooring.

We will be making cardio pieces available in other areas throughout the facility while renovations take place.

DSC_1154.JPG

Octane Cardio Installation

December, 2022

We will be replacing two Octane ellipticals on the main fitness floor with newer models.

Fitness Floor 006.jpg

Resistance Circuit Installation

Beginning January 1st, 2023

We will be introducing a new resistance circuit, the Free Motion Genesis DS line, to the main fitness floor.

Aquatics Reno 2017 -_-52 edit_edited.jpg

Annual Aquatics Complex Closure and Pump Room Renovations

January 23rd - 29th, 2023

We will be making the following updates:

  • Annual cleaning of all areas of the Aquatics Complex

  • Installation of new sanitation and filtration systems for the Leisure pool

The entire Aquatics Complex will be unavailable at this time.

 

Sanitation and filtration system upgrades for the rest of the pools will also be scheduled, dates TBD. Each pool will be closed for one day while installations take place; no more than one pool will be closed at a time.

DSC_1160.JPG

Main Staircase Renovation 

Begining late January, 2023

We will be installing new treads on the main staircase.